Performing work on cleaning the pond
To ensure the required debit of water in the ponds in the village. After hearing and further use of water for irrigation in the fields of PSP "Ukraine", Eridon Bud specialists carried out a set of measures to clean the pond. Execution of works took place in two stages:
Stage №1 Mechanical cleaning of the coastal zone of the pond.
Cleaning and improvement of the coastal zone, removal of reeds, silt, debris, deepening of the bottom. Formation of a water intake zone for a diesel pumping station. Providing the necessary bottom relief for water accumulation in the intake zone in front of the pumping station.
Stage №2 Formation of the channel and restoration of the watercourse (up to the main pond) on the upper lakes.
Since the work was carried out in the spring, and there was no guarantee that the water would be able to fill up completely after the descent, it was decided not to lower the water into the pond, but to perform work with a specialized amphibious excavator, which performs all work and stays afloat.